Due to the improper operation of low temperature chiller system, there is the possibility of water entering into refrigerant system. Therefore, in view of the problem of water supply in low temperature chiller system, process guidance is formulated to serve as a reference for maintenance.
1. Analyse the reasons. Check the whole low temperature chiller system to confirm the cause of freezing damage and find out the leak point.
2. Blow dirt in sections.
(1) First, air compressor can be used to blow water (save nitrogen), until no water mist precipitate. Then blow with high pressure nitrogen, at the same time, heat the nitrogen (the nitrogen cylinder is prohibited from heating).
(2) Because the pipeline of baixo temperature chiller system is complex, water can be blown out in segments by using welding torch in some parts according to specific conditions.
(3) Heat and dry. The capillary, thermal expansion valve, compressor and other small components can be placed in the oven to bake and dry. Do replace the refrigerating oil in the compressor after the water is dried.
1. Vacuum drying
(1) Restore the pipeline and maintain the nitrogen pressure to ensure the air tightness of the system. Then connect the vacuum pump to the system for vacuum drying. (Dry filter barrel should be added to the front end of vacuum pump to avoid excessive water and gas entering the vacuum pump)
(2) In the process of vacuum drying, heat the place where water is easily stored in the pipeline, and the time can be determined according to the site.
2. Debugging and running.
(1) Make sure that the water in the system is basically removed.
(2) Connect the external drying filter barrel to the system and replace the desiccant after running for 5 minutes. At the same time, observe the operating parameters of the unit and pay attention to the sound of the compressor. If the dry filter is cold, the expansion valve frosts, and there is a pressure difference of more than 0.5 kg before and after the return air filter, stop the compressor immediately.
3. Completion of maintenance
(1) Remove the refrigerant pipe from the drying filter barrel and restore it.
(2) Check the supplementary refrigerant quantity. Turn on and check the machine running parameters to confirm normal.
Recomendações relacionadas
-
Heating and cooling cycle machine maintenance boot operation instructions
1867When users choose the heating and cooling cycle machine, they often have to choose the right conditions for their own work, and their knowledge of maintenance and start-up also needs our attention. After the installation of the heating and cooling...
Ver detalhes -
O Jantar de Apreciação do Festival do Meio outono terminou com sucesso
2190The autumn wind is refreshing, and the Mid-Autumn Moon is rounder. At the juncture of time, the annual Mid-Autumn Festival is about to usher in. In this beautiful festival, Wuxi Guanya is full of love and the Mid-Autumn Festival Appreciation Dinn...
Ver detalhes -
Requisitos de temperatura para refrigeradores de implantação iónica em processos de fabrico de semicondutores
1329A implantação iónica é um passo importante nos processos de fabrico de semicondutores para dopar com precisão e controlar as propriedades eléctricas dos materiais semicondutores através da implantação de iões de alta energia nos mesmos. Este processo gera uma grande quantidade de calor...
Ver detalhes -
Descrição das caraterísticas do dissipador de calor no controlo da temperatura das pastilhas
2011Com o desenvolvimento contínuo dos chips electrónicos, a sua tecnologia de dissipação de calor também está a avançar. A tecnologia de controlo da temperatura dos chips LNEYA é continuamente promovida juntamente com o equipamento de teste de chips. A tendência de desenvolvimento de chips de computador modernos...
Ver detalhes
LNEYA Refrigeradores industriais Fabricante Fornecedor